Pumping and pressure reading
The pressure in the chambers should not exceed these values during the following operations:
Operation | Analysis chamber | Preparation chamber - bottom | Preparation chamber - top | Load lock | Electrochemical cell |
sample transfer | 2×10-8 mbar | 5×10-7 mbar | 5×10-7 mbar | 1×10-6 mbar | 1×10-5 mbar |
ion sputtering | 2×10-6 mbar | 2×10-6 mbar | – | – | – |
gas exposure | 1×10-6 mbar | 1×10-6 mbar | 10 mbar | – | 1 bar |
measurements | 5×10-9 mbar | – | – | – | – |
Simplified pumping and pressure measuring scheme (click for full version):

Analysis chamber
Turbomolecular pumpcontrolled by DCU in the right experimental rack![]() ![]() ![]() ![]() ![]() ![]() Parameters: 001: heating on/off 012 venting on/off 002: standby (slow speed) on/off 309: actual rotation speed 329: safety bearing wear 358: rotor imbalance (manuals pump controller ![]() Automatic venting when at ½ of nominal speed. For venting connect nitrogen gas line to the venting valve. Water- and air-cooled. Water cooling is necessary for bake-out. Scroll pumphas no switch. Disconnect/connect the mains cable (orange).For short periods you can just close the valve on the line below the turbopump and leave the scroll pump on. (manual ![]()
controlled by the bottom AML TSP2 controller In the left experimental rack. |
Ionization gaugecontrolled by Prevac MG15 controller in the left experimental rack.![]() ![]() Tap the Emis. button to switch the emission on/off. Tap the pressure value to zoom it in. Tap the pressure unit to change it. The filament can burn at pressures above 10-4 mbar! Never switch on until the turbopump is at full speed and the cold-cathode gauge shows low pressure. (manuals sensor controller ![]()
controlled by MaxiGauge controller in the left experimental rack, channel 1 |
Preparation chamber - bottom
Turbopumping stationcontaining membrane pump and turbopump.Controlled by DCU in the right experimental rack. ![]() ![]() ![]() ![]() ![]() ![]() Parameters: 001: heating on/off 002: standby (slow speed) on/off 309: actual rotation speed (manuals station turbo membrane controller ![]() Automatic venting when at ½ of nominal speed. For venting connect nitrogen gas line to the venting valve. Water-cooled. Water cooling is necessary for bake-out. Titanium sublimation pumpcontrolled by the top AML TSP2 controller In the left experimental rack.![]() ![]() (manuals pump controller ![]()
|
Cold cathode gaugecontrolled by MaxiGauge controller in the left experimental rack, channel 3![]() ![]() ![]() ![]() (manuals sensor controller ![]() |
Preparation chamber - top
No turbomolecular pumpThis chamber is pumped through preparation chamber - bottom (CF100 gate valve) or load lock (CF38 angle valve).Cryopump![]() Helps removing water vapours from the residual gas. Refill with LN2 approx. every 60 minutes. After use blow out LN2 and humidity using compressed air for several hours. During thawing there will be high peaks on the pressure in the chamber (10-6 mbar). Rotary vane pumpfor pumping of the Θ rotary feedthroughs of the manipulatorsIt must be vented after switching off! For short periods you can just close the valve on the line and leave the pump on. (manual ![]() |
Full range gaugecontrolled by MaxiGauge controller in the left experimental rack, channel 2![]() ![]() ![]() ![]() (manuals sensor controller ![]() |
Load lock
Turbopumping stationcontaining membrane pump and turbopump.Controlled by DCU in the right experimental rack. ![]() ![]() ![]() ![]() ![]() ![]() Parameters: 001: heating on/off 002: standby (slow speed) on/off 309: actual rotation speed (manuals station turbo membrane controller ![]() Automatic venting when at ½ of nominal speed. For venting connect nitrogen gas line to the venting valve. Water- and air-cooled. Water cooling is necessary for bake-out. |
Full range gaugecontrolled by MaxiGauge controller in the left experimental rack, channel 4![]() ![]() ![]() ![]() (manuals sensor controller ![]() |
Electrochemical cell (UHV part)
Turbomolecular pumpcontrolled by DCU in the right experimental rack![]() ![]() ![]() ![]() ![]() ![]() Parameters: 002: standby (slow speed) on/off 309: actual rotation speed (manuals pump controller ![]() Manual venting valve. Air-cooled. Be careful not to overheat the pump during bake-out because there is no water cooling! Scroll pumpbelow the platform![]() For short periods you can just close the valve on the line below the turbopump and leave the scroll pump on. (manual ![]()
|
Full range gaugefor UHV or air/nitrogen pressure measurementsControlled by MaxiGauge controller in the left experimental rack, channel 5. ![]() ![]() ![]() ![]() (manuals sensor controller ![]()
for argon pressure measurement |
Ultima modifica il Giovedì, 19 Ottobre 2023 10:08