BaDElPh@VUV Manuals

Beamline procedures

VUV beamline

-Main beamline operations (courtesy of T. White, The University of Warwick)
-Undulator gap values for 2.0 GeV and 2.4 GeV
-Beamline resolution vs photon energy for the different gratings

Instrument procedures

Instruments

-Filling the dewar with liquid nitrogen
-Venting / Pump down
-End of beamtime

Machine

Elettra

-Electronic logbook (elog, requires Firefox).
-Unattended operation: on line form for unattended beamline operation.
-User feedback: notify on elog machine related issues. To post a note, click on "connect to relative EOS".

Material Safety Data Sheet (MSDS)

MSDS

-Ethanol
-Acetone
-Toluene
-Oxygen
-Propylene
-Ethylene
 

 
Ultima modifica il Mercoledì, 08 Gennaio 2025 16:04